세일즈코드화살표

미리보기는
3 페이지 까지 제공됩니다.

  • 공학,기술계열
  • Operations Management 생산운영관리 krajewski ritzman malhotra 9장 연습문제풀이

  • Operations Managemen.hwp
  • 등록인 repojaehoon
  • 등록/수정일 17.03.02 / 17.03.02
  • 문서분량 5 페이지
  • 다운로드 1
  • 구매평가
판매가격 1,300원
같은분야 연관자료
보고서설명
Operations Management 생산운영관리 krajewski ritzman malhotra 9장 연습문제풀이
4. Southern Markets, Inc., is considering the use of ABC analysis to focus on the most critical SKUs in its inventory. Currently, there are approximately 20,000 different SKUs with a total dollar usage of $10,000,000 per year.
9. Terminator, Inc., maufactures a motorcycle part in lots of 250 units. The raw materials cost for the part is $150, and the value added in manufacturing 1 unit from its components is $300, for a total cost per completed unit of $450. The lead time to make the part is 3weeks, and the annual demand is 4,000 units. Assume 50 working weeks per year.
14. In a continuous review inventory system, the lead time for door knobs is 5 weeks. The standard deviation of demand during the lead time is 85 units. The desired cycle service level is 99 percent. The supplier of door knobs streamlined its operations and now quotes a one-week lead tim
본문일부/목차
Operations Management 생산운영관리 krajewski ritzman malhotra 9장 연습문제풀이
4. Southern Markets, Inc., is considering the use of ABC analysis to focus on the most critical SKUs in its inventory. Currently, there are approximately 20,000 different SKUs with a total dollar usage of $10,000,000 per year.
9. Terminator, Inc., maufactures a motorcycle part in lots of 250 units. The raw materials cost for the part is $150, and the value added in manufacturing 1 unit from its components is $300, for a total cost per completed unit of $450. The lead time to make the part is 3weeks, and the annual demand is 4,000 units. Assume 50 working weeks per year.
14. In a continuous review inventory system, the lead time for door knobs is 5 weeks. The standard deviation of demand during the lead time is 85 units. The desired cycle service level is 99 percent. The supplier of door knobs streamlined its operations and now quotes a one-week lead time. How much can safety stock be reduced without reducing the 99 percent cycle-service level?
19. The farmers Wife is a country store specializing in knickknacks suitable for a farm-house decor. One item experiencing a considerable buying frenzy is a miniature Holstein cow. Average weekly demand is 30 cows, with a standard deviation of 5 cows. The cost to place a replenishment order is $15 and the holding cost is $0.75/cow/year. The supplier, however, is in China. The lead time for new order is 8 weeks, with a standard deviation of 2 weeks. The Farmers Wife, which is open only 50 weeks a year, wants to develop a continuous review inventory system for this item with a cycle-service level of 90 percent.
24. Wood County Hospital consumes 1,000 boxes of bandages per week. The price of bandages is $35 per box, and the hospital operates 52 weeks per year. The cost of processing an order is $15, and the cost of holding one box for a year is 15 percent of the value of the material.
연관검색어
#생산관리

구매평가

구매평가 기록이 없습니다
보상규정 및 환불정책

· 해피레포트는 다운로드 받은 파일에 문제가 있을 경우(손상된 파일/설명과 다른자료/중복자료 등) 1주일이내 환불요청 시
  환불(재충전) 해드립니다.  (단, 단순 변심 및 실수로 인한 환불은 되지 않습니다.)

· 파일이 열리지 않거나 브라우저 오류로 인해 다운이 되지 않으면 고객센터로 문의바랍니다.

· 다운로드 받은 파일은 참고자료로 이용하셔야 하며,자료의 활용에 대한 모든 책임은 다운로드 받은 회원님에게 있습니다.

저작권안내

보고서 내용중의 의견 및 입장은 당사와 무관하며, 그 내용의 진위여부도 당사는 보증하지 않습니다.
보고서의 저작권 및 모든 법적 책임은 등록인에게 있으며, 무단전재 및 재배포를 금합니다.
저작권 문제 발생시 원저작권자의 입장에서 해결해드리고 있습니다.
저작권침해신고 바로가기

 

중간과제물바로가기 교체별핵심노트